Hoist installation position
 

Installation position

1.搭设操作棚,并保证操作人员能看清指挥人员和拖动或吊起的物件。施工过程中的建筑物、脚手架以及现场堆放材料、构件等,都不应影响司机对操作范围内全过程的监视。处于危险作业区域内操作棚,顶部应符合防护棚的要求。

1 erection operation shed, and ensure that the operator can see command staff and drag or lift objects. In the process of construction, scaffold building and field stacking materials, components, should not affect the driver of operating range in the whole process of monitoring. In the dangerous area shed, shall comply with the requirements of the top shed.

2.地基坚固。卷扬机应尽量远离危险作业区域,选择地势较高、土质坚固的地方,埋设地锚用钢丝绳与卷扬机座锁牢,前方应打桩,防治卷扬机移动和倾覆。

2 solid foundation. Hoist should be kept away from the dangerous area, choose the higher soil, firm ground, burying ground anchor rope and hoist frame lock, the front should be piling, control hoist movement and overturn.

3.卷筒方向。卷筒与导向滑轮中心对正,从卷筒到第一个导向滑轮的距离,按规定是:带槽卷筒应大于卷筒宽度的15倍,无槽卷筒应大于20倍,以防止卷筒运转时钢丝绳相互错叠和导向轮翼缘与钢丝绳磨损。

3 drum direction. The reel and guide pulley center on it, from the drum to the first guide block distance, according to the regulation is: should be more than 15 times the width of the roll grooved drum, no slot reel should be more than 20 times, in order to prevent the wire rope drum operation mutually staggered and guide wheel flange and the steel wire rope wear.

作业人员要求

Homework personnel requirements

1.卷扬机司机应经专业培训持证上岗,作业时要精神集中,发现视线内有障碍物时,要及时清除,信号不清时不得操作。

The 1 Engineer shall be subject to professional training, work to concentrate, found in the line of sight when there are obstacles, should be promptly removed, not the operation signal is not clear.

2.作业前应先空转,确认电气、制动以及环境情况良好才能操作,操作人员应详细了解当班作业的主要内容和工作量。

2 before the operation should first idling, confirm the electrical, braking and environment in good condition before operation, the operator should understand in detail the main content and work shift work.

3.当被吊物没有完全落在地面时,司机不得离岗。休息或暂停作业时,必须将物件或吊笼降至地面。下班后,应切断电源,关好电闸箱。

3 when the hoisted matter did not fall on the ground, the driver may not leave. Rest or suspend operations, must be the objects or hanging down the cage. After work, should cut off the power, turn off the switch box.

4.司机应随时注意操作条件及钢丝绳的磨损情况。当荷载变化第一次提升时,应先离地0.5m稍停,检查无问题时再继续上升。

4 the driver should always pay attention to wear operating conditions and wire rope. When the load changes first promotion, should first from 0.5m to pause, and then continue to rise check no problem.

5.使用单筒卷扬机,必须用刹车控制下降速度,不能过快和猛急刹车,要缓缓落下。

5 the use of single drum winch, must use the brake to control the descending speed, not too fast and fierce brakes, to slowly fall.

6.禁止使用扳把型开关,防止发生碰撞误操作。

6 prohibit the use of pull type switch, avoid the collision error operation.

7.钢丝绳要定期涂抹黄油并要放在专用的槽道里,以防碾压倾轧,破坏钢丝绳的强度。

7 wire rope to regular butter and should be put in the groove dedicated, in order to prevent rolling strife, failure of wire rope strength.

8.卷扬机的额定拉力大于125KN时应设置排绳器,应在卷筒上的钢丝绳最少应保留3~5圈,钢丝绳的末端应固定可靠。

The rated capacity of 8 hoist should be set up more than 125KN rope, wire rope on the drum shall be at least 3~5 ring should be retained, the end of the wire rope should be fixed and reliable.

9.卷筒外边至最外层钢丝绳的距离应不小于钢丝绳直径的1.5倍

9 drum outside to the outer layer of the steel wire distance shall be not less than 1.5 times the diameter of the steel wire rope

10.作业中,任何人不得跨越正在作业的卷扬钢丝绳。

The 10 operations, and no one may cross winding wire rope working.